Frame Construction Stage
From initial 'Setting-out' of the extremities of the site, to checking by tape measurement of randomly chosen pile locations, spot-check levelling the table pitch of the rafters, Torque wrench testing of each nut and bolt of frame assembly, checking components for plumb level, each table is
Module installation stage
Module installation requires a visual test prior to use.
This identifies Microcracking or any delivery damage prior to use. Damaged modules are uiredidentified by barcode reader, recorded and isolated for client review.
Modules are then laid in correct orientation for daisy chaining the MC4 connectors. Spacing of modules as per manufacturers instructions, with the clamps torqued as specified, and these details recorded on test report sheets and countersigned by the clients agent on site.
DC Cabling to String Inverter
Cables are loaded on Cables are loaded on Mechanical Drumrollers mounted on the teleporters to enable efficient roll out of strings, making long runs of cabling more mounted on the teleporters to enable efficient roll out of strings, making long runs of cabling more manageable for the operatives.