APlus Solar - Your
Decarbonisation Partner providing
Solar Groundmount Solutions.
Get the Solar installation you need, from professionals who are experts and leaders in their fields.
100% Irish owned - training IrisH based staff in ireland
Our Crew are direct employees, compliant in all industry training qualifications, unique in having both bobcat and piling machine operative certification of competence- we invest heavily in training our workforce, they are the future success of our company .
John Brosnan - Project Director Managed Projects
Recently Completed Projects
This list of projects include projects where John Brosnan was employed as CIF PSCS Site Manager. Some of the Construction team key personnel working with him today worked with him on these projects.
Dew Valley Foods 8.5MWP (PSCS Site Managed)
Arrabawn Co-op 6.5MWp (PSCS Site Managed)
Coca- cola 5MWp (Constructed)
Laois Sawmills 2MWp (Constructed)
Coca-cola 3.5MWP (Constructed)
OUR SERVICES
With over 30 years of 100% accident-free experience in the Irish Construction Industry, and recently completed Constructing the
Solar Farm for 'Coca-cola Ballina', an 8.5MWp Ground Mounted Solar farm, the largest Solar Farm in Ireland West.
We are the trusted installers of Solar Farm groundmount systems for Industrial, Commercial, and Agricultural clients.
Piling with Twin Rambo 500 Piling Machines
We are the proud owners of Irish built Rambo 500 Piling machines built by Dennis Doyle Ltd
Although the machines are proving very efficient and reliable, we have the Peace of mind that Dennis can service the units within hours, guaranteeing continuity of service to our clients
Pull out Testing
We arrive to site with our Piling machine and either a
4 Ton or 15 Ton Kolbelco digger. A 900ltr water bowser is provided if waterlogged tests are required. The piles are driven as specified, to the required depths. Using our certified calibrated pull-out test equipment we extract the piles and record the results.
The results will be the basis of our Pull-out test reports issued directly to the client. Soil samples removed from inside the extracted piles can be retained and sent to the client for constituent testing
Quality Controlled Frame assembly
Using the Manufactures layout the Solar tables are constructed as per Manufacturers specifications.
These assembly operations are constantly being monitored by QAQC control within the company.
Reports on each table identify the correct installation of components e.g level uprights, Rafters at specific angles, Rafters lined in along the table length to confirm level tables. Nuts and bolt torqued and marked up, Module clamps torqued to manufacturers correct tolerance
ABOUT US
Using our twin Rambo 500 Piling machines we get through an average 500-600 piles imbedded each day. The success of this claim is wholly dependant on the ground conditions we are given to pile in. In this instance in Ballina, Co. Mayo we piled 3.5 MW of piles in five twelve hour days.
We provide the full package!!
We arrive on site with our own Manitou for off-loading materials. Bobcats are then used for site distribution of materials throughout site making sure that the Manitou is the only machine travelling on the roadway, leaving a clean site where all materials are offloaded at the stoned roadway/ Turning circles, keeping the Bobcats with their mucky tracks on the field site, and not on the clean stoned roadways.
Setting out is done using the latest Leica GPS by our own engineers.
Piling is done by our own Denis Doyle trained and certified Piling Operators
Quality Control of the sub-structure assembly crew is monitored at all stages, assuring efficient installation of the modules.
DC cabling and ducting is installed by our in-house electrical crew. The Inverters are mounted on their frames and the MC4's fitted to the strings, leaving the inverters ready for energisation.
Additional services provided!
Where required we provide the AC cabling and ducting from the inverters to the Transformers leaving the LV and MV contractors responsible for flooding the traffos, energising the site, providing the client with the AC power to their factory
GET A FREE QUOTE
We in Aplus Solar will take time with you assisting you to get a Site Team together doing everything from Site set-up, Setting out, Frame assembly and Module installation, DC stringing up to the Inverter and DC testing prior to commissioning.
We have LV and MV contractors who work with us to assure AC works to the clientsTransformer.

Contact Us
APlus Solar Groundmount systems
Managed the installation of over 40 Megawatt of Solar Farms in the last five years
Setting out, Piling, Erecting Substructure, Installing Modules, DC cabling and ducting Energising Inverters, AC cabling and ducting to the Transformers
We offer the entire one stop shop solutions to Solar Farm construction, with experience of using multiple racking systems